|
|
|
|
|
|
Re-Engineering
|
MCE manufactures some control units installed into the train ETR500.
|
In order to perform these activities, the following operations have been fulfilled:
• replacement of obsolete components
• new production processes
• new test and final inspection processes
|
|
|
| |
| |
M.C. ENGINEERING S.r.l. CP e PI 04548430489
Via G. Di Vittorio 20, 50055 Lastra a Signa (Florence), Italy, Tel +390558728362 e Fax +390558707681
C.C.I.A.A. Firenze n. 461020 - Iscr. Trib. Firenze n. 66568
|
|
|
|